Production growth and comprehensive infrastructure upgrades
PRODUCTION CONFIGURATION ROADMAP
Talnakh Concentrator upgrades
Phase 1:
Increased and optimised operating rate
Improved nickel recovery rate (+1%)
Upgraded facilities
Phase 2:
Capacity increased to 10.2 Mtpa
New technology adopted
Phase 3:
Under construction
Target capacity: 18 Mtpa
Improved recovery rate
New Norilsk Concentrator
Targeted capacity addition: up to 18 Mtpa
New production facility based on proven modern technology
Nadezhda Metallurgical Plant
Phase 1:
Upgrade of flash smelting furnaces to expand throughput to 2.4 Mtpa
Smelting, concentrate drying and filtering facilities upgraded
Phase 2:
Debottlenecking initiatives
Throughput increased to 2.6 Mtpa
Maintenance of flash smelting furnaces at Nadezhda Metallurgical Plant in 2022–2024
3rd furnace at Nadezhda Metallurgical Plant
Continuous converting complex at Copper Plant
Kola Division
Tankhouse 2: Technological upgrade and capacity expansion
Harjavalta (NNH) capacity expansion to 100+ ktpa
Kola Division
ЗObsolete copper line in Monchegorsk shut down (March 2021)
Construction of a new 150 ktpa copper refining line using the roasting, leaching and electrowinning technology
Norilsk Division
Incremental capacity expansion of the copper tankhouse in Norilsk